3 Intriguing Reasons to Use Cold-Formed Steel Framing

Owners and developers want projects with lower construction costs, greater revenue streams and a great end-user experience.

Here are three cold-formed steel (CFS) framing projects that show how it’s done. CFS can help your project (1) deal with poor soil conditions, (2) fulfill sustainable designs and (3) lower their insurance premiums.

1. Handle poor soil conditions

A 7-story, luxury apartment building at 316 S. Madison Street in Iowa City, Iowa, features CFS framing rather than precast concrete. The framing system cut the structure’s weight by 60 percent versus using precast concrete.

The site had poor soil conditions, which would have required robust footings to support a precast concrete building. But, CFS eliminated the need for expensive footings.

So, while concrete was the original choice, CFS framing was more practical.

CFS trimmed the construction timeline by 50 percent and saved as much as $18 million in construction costs, according to Brian Menge, vice president of operations, Wall-tech, Inc. which, along with Wall-panel, LLC, had the framing contract.

“We helped the owner and the architect change the design to a lighter building,” says Menge. “It would be stronger than wood and would be built faster than concrete.”

Madison Street features CFS-framed walls and bar-joist steel.

  • The first floor is post-tensioned concrete with podium slabs.
  • A post-tension transfer slab is at Level 2. Load-bearing CFS-framed interior and exterior panels are on Levels 2 to 7.
  • The panel fabricator built 420 exterior panels, averaging 12 ft. by15 ft., in three months.
316 Madison 1 rs 768x469
CFS framing cut 60 percent of the weight of 316 S. Madison Street, eliminating the need for large footings.

2. Support green roofs

Convent Hill, a 10-story senior facility in Milwaukee, has extensive roof terraces with three inches of soil, wild flowers, ground cover plants and irrigation systems.

The structure represents “a new level of sustainable and green technology,” says the Milwaukee Journal Sentinel. The building features a combination of structural steel beams and load-bearing CFS framing.

Matsen Ford Design Associates of Waukesha, Wisconsin (now part of raSmith, Brookfield, Wisconsin), did the engineering. Structural steel was used up to the second level. The top eight floors feature CFS-framed, load-bearing walls.

  • The wall framing — featuring 362S162-43 to 362S200-68 CFS studs for the interior walls, and 600S162- 43 to 600S200-68 CFS studs for the exterior walls — integrates with cold-rolled channel bridging with clip angles.
  • Matsen Ford specified compressed CFS studs for tight seating in the top and bottom tracks.
  • The roof system includes 1200S200-54 CFS joists set at 24 inches o.c. Long spans were handled using 1200S200-97 CFS joists; corridors used 925S165-43 CFS joists.
  • The roof also features screw-fastened S150 B-deck with tapered insulation, ballasted EPDM roofing and bridging at 6 ft. to 7 ft. o.c. with solid blocking. RC furring was substituted for continuous bottom flange bridging in some locations.

CFS framing has made Convent Hill a sturdy structure. CFS supports five roof terraces — a total of 12,000 sq. ft. — filled with day lilies, spirea, phlox, shrubs and grass.

Convent Hill 1 rs
Convent Hill features 12,000 sq. ft. of terraces supported by CFS framing.

3. Trim your insurance rates

Wood framing was originally specified for the three-story Holiday Inn Express in Hearne, Texas. But, the project’s structural engineer, Dennis Dyke of Abacus Engineering, Hewitt, Texas, switched to prefabricated CFS-framed panels for the build.

Why? To lower insurance premiums. Boost erection speed. And reduce building upkeep.

“The insurance savings were just the beginning of many advantages,” says Jerry Baxter of Hearne Hospitality, the hotel’s owner.

Baxter had always assumed that, because of cost, wood framing was the only acceptable type of construction for a three-story structure.

But, since CFS is light, framing the Holiday Inn Express required less labor than a wood-framed project. CAD design also provided all punches and openings for electrical, plumbing and HVAC in the factory. Drilling and cutting into the walls and chases was unnecessary on the job site.

“The project manager was freed up to focus on other areas,” Baxter says. “He didn’t make constant checks of the cold-formed steel for accuracy and tolerances, which he’d have to do with wood.”

The Holiday Inn Express in Hearne is 37,045 sq. ft. in size. It has 64 guest rooms, a lobby, breakfast area, meeting rooms and back offices.

  • Baxter says his risk and property insurance premiums have dropped.
  • CFS is non-combustible. It simply does not burn, and it never contributes to the spread or intensity of a fire.

Learn more about CFS construction

Want to build faster and cut labor expenses? Check out the Steel Framing Industry Association’s (SFIA) Education Resources page and the following opportunities:

Holiday Inn 1 rs
Prefab CFS panels cut the insurance premiums for the Holiday Inn Express in Hearne, Texas.